Warehouse tent planning starts on your loading yard. What will arrive, where will it go, and how will staff move it? Before asking for a price, put those answers beside your proposed dimensions. You'll give suppliers a clearer brief than a floor area and a photograph alone.
A catalogue photograph is useful for discussing the kind of structure you have in mind. The doorway clearance, ground conditions and quotation scope need separate answers. Here's what to put in the brief before you compare offers.
Map the work before choosing the footprint
Start with the job the space has to do: incoming stock, finished goods, equipment storage or overflow. Explain whether goods will stay on the floor or go into racking. Will staff pick orders inside? Include that work in the layout, as well as the goods themselves.
Sketch a delivery from arrival to dispatch. Mark unloading, checking, storage and picking areas, then draw the routes between them. Leave the required access areas visible on the plan. A rectangle filled with stored goods doesn't show whether the proposed layout leaves room to work.
Imagine, for example, an overflow store beside an existing loading yard. Show the unloading point and the route to the storage position. If the operating layout is still being discussed, tell the supplier. The drawing should identify assumptions that need your confirmation.

Check the clearances your operation needs
The outside dimensions are only the starting point. Have the supplier label side height, roof peak height and each entrance's clear opening on the proposed drawing. Record the usable internal dimensions alongside them. In particular, don't use the roof peak as the height available everywhere inside.
LP Structure's official high-side-height warehouse article discusses pallet storage, racking and forklift access as reasons to consider height. Those are useful starting questions for a purchasing brief. Whether your own equipment and racking will fit still needs checking against the proposed layout.
Send the dimensions of the goods, the proposed storage arrangement and details of the handling equipment. Then check the drawing against that arrangement. Equipment passing through a doorway needs the doorway's clear dimensions; the tent's nominal side height isn't a substitute for that measurement.
Plan entrances around real deliveries
List each proposed entrance and what will pass through it. Put pedestrian access and goods handling on the brief separately. Include delivery vehicle dimensions, handling equipment and existing building doors or yard routes that the new structure needs to connect with.
Where should each door go? Settle the proposed positions before comparing quotations. A generous opening on the wrong side can still leave an awkward unloading route. The plan and quotation should describe the same entrances, clear dimensions and opening arrangements.
Take photographs from the delivery approach as well as inside the proposed installation area. Include nearby structures and label the route on a sketch. A close-up of the ground can show its surface, but it leaves the supplier guessing about the wider layout.
Specify what the enclosure needs to do
What do the goods need? Covered storage and a controlled internal environment call for different questions. If the goods have specified temperature or moisture limits, include those requirements in the brief. Have the supplier explain how the proposal addresses them and identify any additional systems it assumes.
The official catalogue includes a warehouse tent listing that names sandwich walls. Use it to discuss enclosure choices. It doesn't establish which walls another quotation includes, or the indoor temperature a configuration will provide. Get the proposed roof and wall build-up in writing.
Read the roof cover, sidewalls, doors and ventilation as separate items in the quotation. List any proposed insulation or environmental controls separately as well. Mark each item as included, optional or supplied by someone else. An enclosed appearance in a photograph doesn't answer those questions.

Make site conditions part of the brief
Send the installation location with your photographs and any available site drawings. Mark slopes, nearby buildings, drainage routes and restrictions on access or ground work. Be clear about what hasn't been checked, particularly ground conditions and underground services. An unknown item should stay visible in the project brief.
The responsible project team needs to confirm the anchoring proposal and the site information required to develop it. Establish which local approvals apply and who handles them before placing an order. Calling the structure temporary doesn't settle the approvals question.
Keep weather assumptions in writing, too. Which wind, snow and drainage conditions does the proposed design address? Request documentation for your location and configuration. A load figure from another installation won't answer those site-specific questions. Collect the information the responsible designer needs; leave the structural and anchoring decisions with that team.
Compare quotations against the same scope
Keep a common brief for every supplier. Compare the included items beside the quoted totals, and flag any scope that hasn't been described. If one offer leaves anchoring or delivery unclear, get a written answer before treating its total as comparable with the others.
| Part of the brief | What to ask the supplier to show |
|---|---|
| Dimensions and layout | Footprint, usable clearances, entrance positions and a drawing tied to the quotation. |
| Roof and enclosure | Roof cover, wall system, doors, ventilation and the scope of any insulation. |
| Site work | Ground preparation, anchoring, drainage and who supplies or completes each item. |
| Delivery and installation | Transport scope, unloading arrangements, installation responsibilities and the proposed schedule. |
| Documents and handover | Drawings, project documentation, operating instructions and the terms offered for the specific order. |
Don't fill the gaps with assumptions. Keep a “to be confirmed” column in your comparison and return it to the relevant supplier. When the layout or enclosure changes, request an updated quotation and drawing. Check their revision references before using them to place the order.
What to send with your first warehouse tent inquiry
You don't need a finished design to make an inquiry. Send what you know, and mark the gaps. This checklist gives the supplier a starting point without asking you to settle technical questions yourself.
- Use: the goods, equipment and activities the space must accommodate.
- Location: country, installation site, photographs and available site drawings.
- Space: approximate width and length, plus the usable height your operation needs.
- Access: proposed entrance positions and the people, goods or vehicles using them.
- Enclosure: wall preferences and any documented requirements for the stored goods.
- Programme: intended use period and your requested operational date.
- Responsibilities: the site work, approvals and installation tasks you expect each party to handle.
For an initial product comparison, explore the high-side-height tent series or browse the tent structure range. Keep the project resources checklist beside your quotation notes. Use these pages to organise a shortlist, then get written confirmation of the configuration you're actually considering.
Warehouse tent planning questions
How do I choose a warehouse tent size?
Draw the storage layout together with unloading, handling and dispatch areas. Include the routes that people and equipment need, then share the sketch with suppliers. The proposed drawing should identify usable internal dimensions and entrance clearances. Check those measurements against your operation before settling on the footprint.
Does a high side height guarantee forklift access?
No. Check the doorway and internal layout against the dimensions and operating requirements of your actual equipment. Side height doesn't tell you the clear opening through a particular door. Have the project team confirm the relevant clearances on the drawing for the configuration being quoted.
Can I compare suppliers using the tent price alone?
Use the written scope alongside the price. Check roof and wall systems, doors, site preparation, anchoring, delivery and installation against the same brief. Record exclusions and unresolved items beside each quotation. Decide which proposal meets your requirements once those scope differences have been made clear.
Ready to discuss the layout? Send LP Structure your warehouse tent brief with the details you already have and the questions still open. Keep that brief with the drawings and quotation revisions. Warehouse tent planning is easier to follow when those documents describe the same proposed space.
Product references
This guide helps you prepare purchasing questions. Final dimensions, structural design and installation requirements need confirmation for the selected configuration and site.
Turn your layout into a project brief.
Share the intended use, site location, approximate dimensions and access requirements you already know.
Discuss your warehouse project